Shipyard - February photo series Back


Click on a picture to enlarge in a new window.

Click to enlarge   Click to enlarge    Click to enlarge
72 kB   84 kB   73 kB
The Yards, a sequel to January.
The rigging of the first Yard. This one hangs in the rigging loft, next to the footbridge, since 2-23-02.
         
Click to enlarge   Click to enlarge   Click to enlarge
73 kB   80 kB   76 kB
The keel of the 1:10 model.
The stem and stern post are attached to the keel. The 2nd picture shows the assembly of the gripe.
The frames in the picture on the right are reinforced moulds of the frames and are only temporarily used. They are to be adjusted to determine the exact shape of the hull. After that, the eventual frames will be made of oak. The stem, stern and keel already are of the original material.

photography: Pieter Niessink
TOP
Stichting Historisch Schip 'De Delft'